Pilot projects
The first two power stations EnergyPier are to be built as demonstration projects within the institutional and regulatory framework of the Swiss Confederation (FEDRO and SFOE)
The selected sites are in the cantons of Valais (municipality of Fully) and Zurich/Zug (Knonauer Amt district).
— Fully, Valais - EnergyPier
EnergyPier Combined-cycle power station in Fully (VS), A9 motorway
-
Length of the structure
1.609 m
-
Annual production:
~50 GWh/year
Enough to power 12,500 households for a year (over 37,000 people) -
Estimated minimum service life of the structure
150 years
-
Motorway section layout
Straight & Flat
Fully - VS


EnergyPier Combined-cycle power station at Fully, A9 motorway
— EnergyPier Knonauer Amt - ZH-ZG
EnergyPier Combined-cycle power station at Knonauer Amt (ZH-ZG) A4-KW
-
Length of the structure
2.500 m
-
Annual production:
~78 GWh/year
Enough to power 20,000 households for a year (over 56,000 people) -
Estimated minimum service life of the structure
150 years
-
Layout of the motorway section
Winding & undulating
Knonauer Amt – ZH-ZG
Affolten am Albis


EnergyPier Combined-cycle power station at Knonauer Amt (ZH-ZG) A4-KW
English
Français